
|
 

From Vulcania park to basements of individual houses, precast walls have many fields of application, thanks to the advantages that characterize them: safety, productivity, ease of installation.
Contact us, for further information,
|
|
| |
|
|
|
 |
Retaining walls |
- reduced dimensions for earthmoving
- increased safety levels: absorption of horizontal pressure from the ground as soon as they are installed
- possibility of organizing work round the clock (in 3 shifts)
|
  |
| |
|
|
| |
 |
Reservoirs and tanks |
- good waterproofing thanks to the continuity in concrete pouring for the raft foundations and the walls
- execution 3 to 4 times faster
- possibility of organizing work round the clock (in 3 shifts)
- lower costs for small, isolated works
|
 |
| |
|
|
| |
 |
Superstructure |
- installed and poured fast = shorter deadlines for putting the facilities into use
- reduced costs on resurfacing and finishing work
- economic for walls with fixed measurements, staircases and lifts
|
 |
| |
|
|
| |
 |
Property walls |
- lighter and hence easier to install than prefabricated elements
- easier to ensure links and continuity of the reinforcing rods
- 20 to 30% cheaper that traditional solutions
|
 |
| |
|
|
| |
 |
Infrastructure |
- time savings of up to 50%
- reduction in earthmoving requirements (digging + infill)
- improved cost control
- installation less sensitive to weather conditions
- improved working and safety conditions
- controlled costs at property boundaries or in the presence of expansion joints
|
 |
| |
|
|
| |
 |
High Structures |
- cost advantages increase at heights of over 5 m
- low safety costs, an aerial lift is the only equipment required to place the linking rods and pour the concrete.
- no construction joints
- easy to turn the panels over
- cost advantages increase at heights of over 5 m
- low safety costs, an aerial lift is the only equipment required to place the linking rods and pour the concrete.
- no construction joints
- easy to turn the panels over
|
 |
| |
|
|
| |
 |
Architectonics |
- load-bearing structures that meet architectural requirements
- numerous original, one-off possibilities
|
 |
| |
|
|
| |
 |
Silos |
- 3 to 4 times faster to install
- smooth surfaces for easier maintenance
- possibility of providing exposed surfaces made with blast furnace cement
- precise placing of reinforcing rods ensured
- use of a pump to pour the concrete economical from 40 cu. m up
|
 |
| |
 |
|
 |
 |
 |